Published
2021-12-15

How to Cite

Cadavid Osorio, C. A. ., Vanegas Camacho, S. C. ., & Muñoz Rojas, H. A. . (2021). Risk management analysis for the mitigation of the environmental impact in the Quimbo hydroelectric project: A perspective of the PMBOK. Documentos De Trabajo ECBTI, 2(2). https://doi.org/10.22490/ECBTI.5303
Metrics
Metrics Loading ...

Risk management analysis for the mitigation of the environmental impact in the Quimbo hydroelectric project: A perspective of the PMBOK

DOI: https://doi.org/10.22490/ECBTI.5303
Section
Artículos
Carlos Alonso Cadavid Osorio
Sandra Constanza Vanegas Camacho
Henry Alfonso Muñoz Rojas

The objective of this initiative is a theoretical dissertation based on the analysis of environmental risks in the El Quimbo Hydroelectric project within the framework of the PMBOK guide (PMI, 2017). The problem is focused on elucidating how the PMBOK proposal allows structuring the events that positively and negatively affected the performance of the project where social resistance activities caused, among others, by environmental problems, which have generated delays, construction suspensions, are reported. and operation, complaints, constant litigation, sanctions, over costs and that affect the normal development of the project causing economic losses of millions of dollars.

Through a rigorous bibliographic review, an analysis of the project structure and information on similar cases, it is intended to propose an environmental risk management scheme applying the PMBOK guide on project management experiences and practices at the Hydroelectric “El Quimbo ”.

This project is developed as a work option monograph in the Project Management Master of the Open and Distance National University (UNAD).This project is developed as a monograph for the option of degree work in the Master of Project Management of the Open and Distance National University (UNAD).