When the Publicaciones e Investigaciones Journal receives an original study or article from its author(s), whether by email, postal service, or the platforms available for said purpose, know that it may be published in physical or electronic formats in national or international archives, databases, or SIRES. As such, Publications and Research authorizes the reproduction and citation of said material, provided that the description of information is carried out in conformity with bibliographic norms, and mention the corresponding names, authors, article, issue, and pages. Publications and Research, in advance, expresses that the information, concepts, and methods are the responsibility of the author(s). As such, the UNAD does not have any influence whatsoever over that expressed in the manuscript.
Preventive maintenance plan to increase the availability of heavy fleet equipment at the Juvier S.A.C. concrete plant preventive maintenance plan to increase the availability of heavy fleet equipment at the Juvier S.A.C. concrete plant
This research contributes to Sustainable Development Goal (SDG) 9: Promote efficiency and sustainability in the industrial sector, as well as to guarantee equitable access to infrastructure. Its main objective was to develop a preventive maintenance plan to increase equipment availability at the JUVIER S.A.C. concrete plant. The investigation is an applied type, with a quantitative approach and
an experimental design. The sample consisted of eight heavy equipment at the concrete plant. Document review was used as a technique based on information collected at the company. Among the main findings, is highlighted that the availability percentage before the implementation of preventive maintenance was 86.95%. However, after its implementation, it increased to 95.97%, representing a 9.02%. improvement. The budget allocated for maintenance execution, based on the activity schedule for one month, was S/.13,406.88, and the total cost for the three months was S/. 40220.64. In conclusion, the results indicated that, by implementing the preventive maintenance plan, equipment availability increased significantly, thus confirming the effectiveness of preventive maintenance in equipment operation.