Published 2025-11-25
license
Article

Preventive Maintenance Plan to Increase the Availability of Heavy Fleet Equipment at the Juvier S.A.C. Concrete Plant

DOI: https://doi.org/10.22490/25394088.9992

Authors

Ashley Murillo Fernandez Cesar Vallejo University image/svg+xml
Buscal Kinosita Pierina Lisett Cesar Vallejo University image/svg+xml

This research contributes to Sustainable Development Goal (SDG) 9, which focuses on promoting efficiency and sustainability in the industrial sector, as well as to guarantee equitable access to infrastructure. Its main objective was to develop a preventive maintenance plan to increase equipment availability at the JUVIER S.A.C. concrete plant. The investigation is an applied type, with a quantitative approach and an experimental design. The sample consisted of eight heavy equipment at the concrete plant. Document review was used as a technique based on information collected at the company. Among the main findings, it is noteworthy that the availability percentage before the implementation of preventive maintenance was 86.95 %.  However, after its implementation, it increased to 95.97 %, representing a 9.02 % improvement. The budget allocated for maintenance execution, based on the activity schedule for one month, was S/.13,406.88, and the total cost for the three months was S/. 40,220.64. In conclusion, the results indicated that, by implementing the preventive maintenance plan, equipment availability increased significantly, thus confirming the effectiveness of preventive maintenance in equipment operation.

keywords: availability, equipment, maintenance
license

How to Cite

Murillo Fernandez, A., & Buscal Kinosita , P. L. (2025). Preventive Maintenance Plan to Increase the Availability of Heavy Fleet Equipment at the Juvier S.A.C. Concrete Plant. Publicaciones E Investigación, 20(1). https://doi.org/10.22490/25394088.9992
Almétricas